How much does it cost?
A Wastec system is much less expensive than most other waste technologies both in capital and running costs. Operating costs (based in the UK) for processing MSW are likely to be in the range of £10 tonne for a 50,000 tpa plant normally with the value of recovered materials to be offset against this figure. A twin streamer system is designed to process 25,000 tpa operating on a single shift but throughput can be doubled with the introduction of a second shift.

For more detailed information on the costs of a Wastec system please contact sales@wastec.co.uk


Back to FAQs?
News
Wastec complete 'clean' MRF trial on co-mingled recyclables
Wastec's Seamer Carr plant achieving targets
LAWR article
Wastec in the Juniper Report
Subscribe to regular news updates
Home
The Wastec System
Sustainable solutions
FAQs
See it working
Contact

Designed by Touchmedia